Redondo Outfall - Federal Way, WA

A Redondo Pipeline 2

Project Details

  • Structural design of half-mile long bottom-laid HDPE outfall pipeline to a depth of 400 ft
  • Elements included concrete pipe anchor blocks, pile supported concrete transition anchor blocks with frangible pipe connections, sheetpile for slipline/pipe pulling and temporary bypass pit.
  • Review of deployment plans and services during construction and during pipe deployment.

Other Pipeline, Water and Wastewater Projects

  • University Audi - Storm Drainage System - Seattle, WA
  • Boston Harbor Wastewater Treatment Plant - Thurston County, WA
  • South Prairie Wastewater Treatment Plant - South Prairie, WA
  • Coca-Cola Bottling Company - Chemical Building Waste Treatment - Bellevue, WA
  • Shelton Wastewater Treatment Plant - Shelton, WA