Redondo Outfall – Federal Way, WA
- Structural design of half-mile long bottom-laid HDPE outfall pipeline to a depth of 400 ft.
- Elements included concrete pipe anchor blocks, pile supported concrete transition anchor blocks with frangible pipe connections, sheetpile for slipline/pipe pulling and temporary bypass pit.
- Review of deployment plans and services during construction and during pipe deployment.
Other Projects
- Boston Harbor Wastewater Treatment Plant - Thurston County, WA
- Coca-Cola Bottling Company - Chemical Building Waste Treatment - Bellevue, WA
- Shelton Wastewater Treatment Plant - Shelton, WA
- South Prairie Wastewater Treatment Plant - South Prairie, WA
- University Audi - Storm Drainage System - Seattle, WA
- Brightwater Pipeline EIS - King County, WA
|
|