Redondo Outfall – Federal Way, WA

  • Structural design of half-mile long bottom-laid HDPE outfall pipeline to a depth of 400 ft.
  • Elements included concrete pipe anchor blocks, pile supported concrete transition anchor blocks with frangible pipe connections, sheetpile for slipline/pipe pulling and temporary bypass pit.
  • Review of deployment plans and services during construction and during pipe deployment.